|
Pipelines Laying |
One of The annual scope of work: Dozens of kilometers of pipeline each year. The Company recently laid the “New National Water Carrier”, a system designed to transport all the water produced by all the coastal desalination plants. The professional work crews work continuously, under arduous weather conditions, and in all ground environments: Urban, agricultural, sand or rock. While laying the pipes, other associated work is also conducted, such as: concrete pouring, cathodic protection, overcoming? obstacles, etc. Upon completion of the pipeline, a pressure test is conducted on every pipeline. There are no shortcuts in this system. A drop of water pumped in to the beginning of the pipeline, exits only at the en |